qiao@hvtest.cc15871365102
  • UHV-802 3 phase relay tester Secondary Current injection Test Set

    UHV-802 3 phase relay tester Secondary Current injection Test Set adopts the advanced structure of single machine independent operation and can also be connected to the laptop operation. It not only has the superior performance and advanced function of the large tester, but also has the advantages of small, flexible, easy to operate, high reliability, and high performance-price ratio.

    Product Details of UHV-802 3 phase relay tester Secondary Current injection Test Set


    relay test device

    Product Parameters

    AC current output

    Phase current output (effective value)

    0~40A

    Output Precision

    0.2 degree

    3 phase parallel current output (effective value)

    0~120A

    A Long-time Phase current

    10A

    Maximum output power of Phase current

    450VA

    Maximum output power of 3 parallel current

    900VA

    Maximum Permitted work time of 3 parallel current

    10S

    Frequency range ( fundamental)

    0~1000Hz

    Harmonic time

    0~20

    DC current output

    Current output

    0±10A / phase,  0±30A / 3 parallel

    Output Precision

    0.5 degree

    AC voltage output

    Phase voltage output (effective value)

    0~120V

    Output Precision

    0.2 degree

    Line voltage output (effective value)

    0~240V

    Phase voltage / Line phase output power

    80VA / 100VA

    Harmonic time

    0~20

    DC voltage output

    Phase voltage output range

    0±160V

    Output Precision

    0.5 degree

    Line voltage output range

    0±320V

    Phase voltage / Line phase output power

    70VA / 140VA

    Time measuring range

    0.1ms  9999s accuracy of measurement 0.1ms

    Volume & weight

    400×360×160mm³ 15kg

     

    Nicknamerelay test devicesecondary current injectionthree phase relay tester3 phase relay tester


    Product Features

    Industrial control computer and Windows operating system have been set in this tester. Please do not switch on or off the power supply of host too frequently.

    USB interfaces are allocated on the faceplate or backplate, which allow hot-swap USB equipment (such as flash disk, etc), but the drawing or inserting must be done after the data transmission has been completed.

    In order to ensure that the Windows operating system built in the industrial control computer can run steadily, please do not delete or alter the documents in hardware and the logo on the desktop at will. Please do not operate, alter, increase, delete or use the built-in Windows system to avoid any damage on the operating system. When using the USB disk to copy data, please do ensure that the flash disk is clear without virus, and also please do not use the flash disk to set other software programs in this system.

    When connecting outside keyboard or mouse, please do not connect wrong terminal; otherwise the Windows operating system wont be started up normally.

    Please do not shut off power supply directly during outputting so as to avoid the wrong protection action due to incorrect output.

    When switch quantity is compatible with both idle contact and the potential 0DC250V and uses charged contact, the high terminal (anode) of contact potential should be connected with the common end +KM.

    Do not insert objects (e.g.screwdrivers,etc.) into the ventilation slots or any input/output sockets. When taking the tester into operation,make sure that the air slots,the power switch and the power supply plug at the test set remain unobstructed.The instrument should be laid uprightly, or unfold the bracket for slightly tilted placement

    Do not lead external AC/DC power into the voltage and current output sockets of tester.

    If the disturbance is stronger on the spot or high safety is required, before doing the test, please ground the outlet of power source or the protective earth of the tester.

    If the interface data is wrong or you can not input correctly when using this tester, you can settle the problem as follows: delete the para file under the E\Relaystar\, and then restart the running program, all data on the interface will be resumed to the default.









    You Might Also Like

    • Have Any Questions!

      DON'T HESITATE TO CONTACT US ANY TIME
      Contact us
    • Visit Us

      Building 6, Optics Valley Optical-Mechanical Industrial Park, 84 Gaoxin 5 Road,
      East Lake New Technology Development Zone, Wuhan City, Hubei Province, China

    • Email Us

      qiao@hvtest.cc

    • Call Us

      +86-15871365102